27. Dezember 2024|
AI
|11 months ago10km Holiday Traffic Jam at Gotthard Tunnel
Post-Christmas travel causes significant delays at Switzerland's Gotthard tunnel, with waiting times exceeding 80 minutes as holiday travelers head south.

AI
Generated IllustrationKey Takeaways
AI
- A 10-kilometer traffic jam formed at the Gotthard tunnel's north portal
- The traffic jam occurred between Erstfeld and Göschenen in canton Uri
- Swiss Federal Railways (SBB) increased train services to winter destinations
By The Numbers
80 minutes
Waiting time at tunnel
10 kilometers
Traffic jam length
They Said
"The slowdown in traffic between Erstfeld and Göschenen in canton Uri was due to traffic overload"
1
Holiday Traffic Crisis at Gotthard
2
Traffic Impact and Delays
3
Alternative Transport Solutions
4